Phased, not single-visit
Rough, final and touch-up. Settling dust makes a one-visit promise something nobody can deliver honestly.
Serving Apple Valley, Minnesota & surrounding areas
Post-construction · Apple Valley
Construction dust does not get cleaned once. It settles for days out of the air and out of every cavity in the building. Post-construction cleaning is phased work, done in the right order, so the space is genuinely ready for handover.
Why one clean is never enough
Post-construction cleaning is the process of taking a finished build or renovation from trades-complete to move-in ready. It is not a deep clean. The soil is different, the tools are different, and the work has to be staged rather than done in a single visit.
Drywall dust is the reason. It is extremely fine, it becomes airborne from any activity, and it settles into light fixtures, vents, window tracks, cabinet interiors, and every ledge in the building. Clean a room once and walk through it the next day and there is a visible film again. That is not a failure of the clean, it is the nature of the dust.
There is also residue no ordinary clean deals with: adhesive from protective film, stickers on windows, appliances and fixtures, paint flecks and overspray, caulk smears, grout haze on new tile, and fine metal or sawdust in corners. Each needs its own approach, and several will damage a new surface if handled with the wrong product.
Three phases, in order
Doing this properly means accepting up front that the building will need attention more than once, and planning around the trades still working.
The rough clean happens once major construction is finished but before final finishes and fixtures go in. This is bulk debris removal, sweeping out the space, clearing window tracks and cavities, and getting the gross material out so finishing trades can work in a clean environment.
The final clean happens after the trades are out. This is where the detail work lives: all surfaces including tops of doors, frames, ledges and cabinet interiors, light fixtures and fans, vents and registers, windows inside including tracks and frames, sticker and adhesive removal, fixture polishing, and floors done last with the correct method for each new surface.
The touch-up clean comes a few days later, and this is the phase that gets skipped and then regretted. Dust that was airborne during the final clean has now settled. A relatively short visit to re-wipe horizontal surfaces and re-do floors is what makes the difference between a space that looks clean at handover and one that looks clean a week later.
Rough, final and touch-up. Settling dust makes a one-visit promise something nobody can deliver honestly.
Vacuum recovery with filtration and damp methods, working top-down. Dry sweeping fine dust simply relaunches it into the air.
Adhesive, stickers, grout haze, paint flecks and caulk smears each need a different method and the wrong one marks new surfaces.
Window tracks, vents, cabinet interiors, drawer runners and light fixtures hold dust that falls out later if it is left.
New finishes, coatings and glass are easy to scratch or dull. Method is chosen to suit the material, not the speed of the job.
Projects we clean
Scale and access change the plan more than anything else, so the phasing is set against the project rather than a fixed package.
Typical Apple Valley post-construction jobs:
Once the building is handed over and occupied, ongoing cleaning is a normal maintenance schedule rather than post-construction work.
How this work is priced
Post-construction cleaning in Apple Valley commonly runs about $0.30 to $0.75 per square foot for a final clean, which puts a typical new home somewhere around $600 to $1,800. Rough cleans and touch-up visits are usually quoted separately, with touch-ups often in the $200 to $450 range depending on size.
Cost depends on square footage, how much debris the trades left, window count and whether tracks and exteriors are included, how much sticker and adhesive residue is present, floor types, and whether all three phases are wanted or only the final. Because the state of a site at handover varies so much, this is quoted after seeing it or after clear photos.
Square footage, project type, which trades remain and the handover date. That determines the phasing more than anything else.
Which phases you want, whether windows and exteriors are in scope, and what the trades will clear themselves before we arrive.
Fixtures, ledges, tracks and cavities first, residue removed by type, then floors with the right method for each new surface.
A short visit a few days later catches settled dust, so the space looks right at walk-through rather than only on cleaning day.
Builder and homeowner questions
Because drywall dust stays airborne for days and keeps settling. A final clean done while dust is still suspended will look perfect that evening and show a film within 48 hours. The touch-up visit is short and inexpensive relative to the final, and it is the difference between a clean handover and an awkward walk-through.
A rough clean can run alongside trades and actually helps them work in a cleaner space. The final clean should not, because anyone still cutting, sanding or drilling will undo it as fast as it is done. We will schedule the final for after the trades are genuinely finished.
We remove general cleaning debris and light leftover material. Bulk waste like offcuts, packaging, old fixtures or anything needing a dumpster or a disposal run is normally the contractor's responsibility. Tell us what is being left and we will say clearly what is in scope and what is not.
Yes, that is a standard part of the final clean. Manufacturer stickers, protective film and adhesive residue come off windows, glass, appliances, fixtures and hardware using methods that will not scratch the new surface. This is slow, detailed work and it is a meaningful share of the hours on any new build.
On a post-construction job, yes, and it matters more here than on any other type of clean. Cabinet interiors, drawers, closets and shelving collect a surprising amount of fine dust and sawdust during installation, and it is far easier to deal with before anyone moves belongings in.
We clean vent covers, registers and the visible surfaces around them. Cleaning inside the ductwork is a separate trade with different equipment. After a significant build or renovation it is genuinely worth having ducts cleaned by a specialist, because that is where a lot of construction dust ends up circulating from.
Phased, detailed, handover ready
Tell us the project size, which trades are still on site, and your handover date. We will recommend the phases that fit the schedule and quote each one, so the space is genuinely ready when it is handed over.
Request a quote
Send the details and we will come back with a written scope and a flat price, usually the same day.